# Interactive Pre-Submission Audit Simulator

Simulate Regulatory Review Scrutiny Before You File.

## Featured Sample Scenarios
1. **United States (BLM / NEPA Tier 1 EIS) — 450 MW Solar PV & BESS Facility**:
   - Proposal Identifier: DOI-BLM-NV-2025-0142-EIS
   - Scale: 2,850 Acres | Investment: $420M USD
   - Pre-Submission Verdict: ACTIONABLE GAPS DETECTED (REMEDIATE MITIGATION DEFICIT)
   - Finding: Construction groundwater abstraction exceeds local basin replenishment thresholds; Desert Tortoise critical habitat buffer extends within 0.8 miles requiring USFWS Section 7 formal consultation.

2. **European Union (Directive 2014/52/EU) — 120 MW Offshore Wind & Hydrogen Hub**:
   - Proposal Identifier: EU-EIA-2025-DE-0089
   - Scale: 45 Square Kilometers | Investment: €310M EUR
   - Pre-Submission Verdict: PRE-SUBMISSION BLOCKED (NATURA 2000 MITIGATION DEFICIT)
   - Finding: Subsea cable landfall route intersects designated Natura 2000 Marine Special Area of Conservation (SAC) without complete Article 6(3) Appropriate Assessment; hydroacoustic pile-driving noise mitigation unspecified.

3. **Australia (Commonwealth EPBC Act & WA EPA) — Hard-Rock Lithium Mine**:
   - Proposal Identifier: EPBC-2025-09812 / WA-EPA-0441
   - Scale: 1,600 Hectares | Investment: A$580M AUD
   - Pre-Submission Verdict: PRE-SUBMISSION BLOCKED (SUBTERRANEAN FAUNA DEFICIT)
   - Finding: Subterranean troglofauna and stygofauna sampling incomplete; waste rock landform outer embankment designed at 22° slope requiring long-term geomorphic erosion stability modeling.

4. **Middle East / GCC (NCEC Standards & Equator IV) — Seawater Desalination & Logistics Hub**:
   - Proposal Identifier: NCEC-2025-CR-1190
   - Scale: 320,000 m³/day Capacity | Investment: $680M USD
   - Pre-Submission Verdict: READY FOR SUBMISSION (CONDITIONAL CLEARANCE EXPECTED)
   - Finding: Near-field Cormix hydrodynamic brine dispersion model verified; secondary containment and marine intake silt curtain protocols compliant.