See what an audit finds.

Explore illustrative projects, review the findings, and see the evidence needed to address them. These are sample reports, not live project assessments.

Sample findings

Select an illustrative project to review its gaps and next steps.

DOI-BLM-NV-2025-0142-EIS•United States (BLM / NEPA Tier 1 EIS)•Clean Energy & Battery Storage

Solar & battery storage

Project team: Apex Horizon Clean Power LLCScale: 2,850 AcresInvestment: $420 Million USD
Sample review statusGaps to resolve
Nearby projects

Two solar arrays are within 2.5 miles. Combined construction water use needs further review.

Terrain risks

Gentle slopes under 2.5°. Drainage design still needs evidence for severe storm flows.

Protected habitats

Protected tortoise habitat is 0.8 miles away. Consultation and a biological assessment need to be documented.

Document gaps

Construction water figures conflict: 350 acre-feet in the project description and 510 in the groundwater report.
The battery fire-safety plan does not explain how firefighting water will be contained.
The cultural resources record lacks evidence of tribal consultation.

Questions to prepare for

1."Which construction water figure is correct?"
Evidence to add:A consistent water balance and confirmed off-site supply arrangements.
2."How will the project protect tortoise habitat and wildlife movement?"
Evidence to add:A biological assessment, survey protocol, and proposed wildlife corridor layout.
3."How will battery firewater be contained?"
Evidence to add:A documented fire-safety assessment and containment design.
Want a review of your draft? Share your project details to discuss the scope.